Elbarkouky, M M G and Fayek, A R (2011) Fuzzy Similarity Consensus Model for Early Alignment of Construction Project Teams on the Extent of Their Roles and Responsibilities. Journal of Construction Engineering and Management, 137(06), 432–40.

Evia, C (2011) Localizing and Designing Computer-Based Safety Training Solutions for Hispanic Construction Workers. Journal of Construction Engineering and Management, 137(06), 452–9.

Hong, T, Cho, K, Hyun, C and Han, S (2011) Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building. Journal of Construction Engineering and Management, 137(06), 393–402.

  • Type: Journal Article
  • Keywords: Scheduling; Core walls; High-rise buildings; Simulation; Scheduling; Core walls; High-rise building; Simulation;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000300
  • Abstract:
    Many existing studies about construction schedule management focus on the planning phase of a project, particularly on schedule estimation based on the labor resources involved in the project. However, equipment resources, which are another crucial factor in the productivity of a construction project, have not been considered in existing research. Therefore, this study aimed to develop a schedule estimation model considering both labor and equipment resources. For the purpose of this study, core wall construction was selected because it is a very important construction activity in terms of schedule estimation for high-rise building construction. To develop a schedule estimation model for core wall construction, an in-depth case study was conducted. On the basis of the results of the case study, a simulation model was developed using the CYCLONE method. Finally, by using the results of the simulation, a schedule estimation model for core wall construction was developed by conducting multiple-regression analysis. By using the developed model, a project manager can easily, quickly, and accurately perform schedule estimation when there are problems that may cause construction schedule delays during the construction phase.

Lee, S, Jeon, R, Kim, J and Kim, J (2011) Strategies for Developing Countries to Expand Their Shares in the Global Construction Market: Phase-Based SWOT and AAA Analyses of Korea. Journal of Construction Engineering and Management, 137(06), 460–70.

Ozorhon, B, Arditi, D, Dikmen, I and Birgonul, M T (2011) Toward a Multidimensional Performance Measure for International Joint Ventures in Construction. Journal of Construction Engineering and Management, 137(06), 403–11.

Said, H and El-Rayes, K (2011) Optimizing Material Procurement and Storage on Construction Sites. Journal of Construction Engineering and Management, 137(06), 421–31.

Shen, L, Wu, Y and Zhang, X (2011) Key Assessment Indicators for the Sustainability of Infrastructure Projects. Journal of Construction Engineering and Management, 137(06), 441–51.

Tserng, H P, Liao, H, Tsai, L K and Chen, P (2011) Predicting Construction Contractor Default with Option-Based Credit Models—Models’ Performance and Comparison with Financial Ratio Models. Journal of Construction Engineering and Management, 137(06), 412–20.